Chat with us, powered by LiveChat
Skip to main content
30 years 180x170

CELEBRATING OVER 30 YEARS OF AWARD WINNING

RAISED FLOORING SOLUTIONS



We are specialists in the supply and installation of new and recycled raised access flooring. 

We are award winning market leaders in the recycling and re-use of raised access flooring 

Want to sell an existing raised floor?

Contact our stripout department at stripout@rmf-services.co.uk

 

CONTACT US TODAY

We understand that every project is unique, we draw upon our extensive specialist expertise and build upon in further by developing a deep understanding of the project requirements.

 

TESTIMONIALS

"I can certainly recommend their Eco Range system, RMF are my first call on all raised floor works"


Mark Hemsley - Project Director - ITC
"I would not hesitate to use RMF on any future projects as I have now used them on my last 3 projects whereby they have delivered all of these to a very high standard without any defects within the 12 month defect periods but also the handover of all floors have zero defects."


Sat Chima - Construction Manager - Willmott Dixon Interiors
"RMF are my preferred choice of raised floor contractor regardless of the project size. I know they will always respond competitively, swiftly and professionally undertake their works, therefore reinforcing my on-going confidence in selecting them."


Gareth Davey, Contract Manager, Bluu Solutions
"With their Eco range of products RMF are leading what I hope is a step-change in the industry approach to sustainable product sourcing."


Daniel Winder RIBA BA BArch | Sheppard Robson
"RMF completed our 210 Euston Rd project which consisted of approximately 6,070 m2 of new raised access flooring. As with most structural refurb projects, things were not always smooth sailing and RMF’s flexibility in reacting to available works was a big assist in completing the project. A quality install and generally proactive contractor"


- Dick Humphreys (Collins Construction)
"I have recently worked with RMF team on a 29,000sq ft fast track High Specification project which meant lots of various floor levels and contours, RMF embraced the challenges during the design period with project team overcoming obstacles to ensure effective execution in readiness for following trades. RMF supervision was heavily involved in setting out, installation and challenging logistics, directors attending weekly meeting to ensure programme was maintained."


- Mark McKenna (BW – Workplace Experts)
"A very good experience, off site management when called upon, very responsive, but key to this difficult project is the site team, headed up by Steve Wiseman who was extremely helpful with his attitude to work together to get the job done, which was a quite tight floorplate with lots of cuts. Steve achieved this by looking ahead, ensure the team did not run out of materials and achieved each days planned progress with a positive attitude. Look forward to working with RMF again."


- Dick Clachan (BW – Workplace Experts)